Cargo Three-Wheeler Assembly Line
10~15 min/unit | Floor Rail Cart Carries 3t Frame, Engine Alignment, Accumulation Buffer Cargo three-wheeler frames are ...
Box Truck Assembly Line
Dry Freight and Reefer on One Line | Heavy-Duty Slat Conveyor + Electric Hoist + 4-Axis Fastening + Leak Test | 8~12 min...
Electric Cargo Three-Wheeler Assembly Line
What Extra Stations Does a Three-Wheeler Need When Going Electric? The difference from the fuel version: no engine, add ...
Pickup Truck Assembly Line
Frame, Cabin, and Cargo Bed — How Three Separate Pieces Come Together on One Line A pickup is not a unibody vehicle. It ...
Passenger Three-Wheeler / Enclosed Cabin Assembly Line
Why Separate the Body Panels and the Frame into Two Parallel Lines? The pain point for cabin three-wheelers is not the c...
Engine Marriage Module
100,000~300,000 Units/Year | Alignment Press + Multi-Spindle Fastening + Cold Test Stand + AGV Delivery Separating engin...
Special-Purpose Three-Wheeler Assembly Line
30-min Changeover | Modular Upper-Structure Platform, Quick-Change Tooling, Plug-and-Play Test Modules Sanitation spraye...
Tire & Chassis Parts Kitting Module
Mixed-Model Production Without Bottlenecks | Automatic Sorting + Leak Pre-Check + Kanban Pull + AGV Delivery Tires are a...
Three-Wheeler Cargo Bed / Cabin Sub-Line
What Happens When You Take the Cargo Bed Off the Main Line? Removing cargo bed and cabin assembly from the main line and...
Medium/Heavy Truck Frame Assembly Line
How Is a 6-to-12-Meter Frame Riveted and Flipped on the Line? A frame 6 to 12 meters long, weighing 500 to 2000kg. Opera...